FSC CRAFTHomeJewelryOrganizersResourcesBlogContactWholesale

Wholesale Jewelry Manufacturing: MOQ, Lead Time, What to Ask

Inside our Shenzhen workshop — production, QC and packing.

Shenzhen, GuangdongAdjacent to the Dongguan Chang'an cluster
NDA & IPYour designs stay yours
~15 DaysSample lead time
~25 DaysBulk: bead strands
~45 DaysBulk: metal & boxes
≤ 24hReply to your brief
CERoHSFCC — Compliance testing & certification available on request per order — verified to ASTM B117 / EN 1811 / PVD thickness standards.

Wholesale sourcing goes wrong in predictable places. Not in the product — in the assumptions made before it exists: that the sample will match production, that the price will hold, that the compliance paperwork will arrive with the shipment rather than before it.

This page answers the questions importers ask first, in the order they ask them. It is deliberately plain. Everything below is also stated in our ordering terms.

First, decide what you are buying

There are two different things a supplier can sell you, and the distinction decides everything about price, speed and flexibility:

Our lead times apply to production. If what you need is a catalogue item this week, that is a legitimate purchase and we will tell you honestly whether it is in stock — we are a manufacturer, not a warehouse, and we would rather route you correctly than sell you the wrong thing.

Minimum order quantities, stated plainly

The organizer minimum is the one that catches buyers out, so here is the honest reason: why jewelry boxes have a 500-piece MOQ. If it is a blocker for your program, tell us early rather than discovering it in week three — there may be a route around it, and there may not.

Lead times: what the numbers mean

Those figures cover production, not freight, customs or holiday shutdowns. They stack on top of transit.

A 45-day figure invites the comparison with suppliers quoting two or three weeks. The honest answer is in why bulk jewelry production takes 45 days: some suppliers are selling stock, and some are quoting a simpler build. Ours applies to your design, made once. We would rather explain that than pretend the number is short.

Sampling: the stage that protects everything else

About 15 days for a sample, and the bulk clock starts when you approve it. Most of that window is tooling, material, and the finishing cure — not someone cutting a piece on a Tuesday.

What shortens it is almost entirely up to you: a complete brief, a precise finish spec, and approval on the day the sample lands. What happens during those 15 days walks through the sequence, and how to brief a manufacturer is the checklist to send with your RFQ.

Compliance, before production

If you sell into the EU, EN 1811 nickel release and the 0.2 µg/cm²/week REACH limit apply to the finished article. If you do not know that sentence yet, your retailer will teach you, and it will be after the order.

We verify nickel release per batch and issue per-order documentation rather than publishing pass/fail numbers, because a generic certificate is not evidence for your product. The full explanation is on compliance and testing, and EU vs US compliance covers the difference between the two markets.

Quotes: what moves the number

Unit price is set by tooling, material, process steps and volume. Setup is charged once per design and then amortised, which is why reordering is cheaper than the first order looks.

We would rather you understand the number than be surprised by it: what actually moves a jewelry supplier's quote.

Before you pay anything

The checklist is on what to check before paying a supplier deposit, and the audit questions are in a buyer's checklist for auditing a China supplier.

How the goods leave, and what comes with them

Two shipping terms, and the difference is worth understanding before you compare quotations.

FOB and CIF are not terms we quote. Both move the freight onto a figure you cannot see at the point of comparison, which is the opposite of what a first order needs.

What ships with the goods, issued per order against the batch:

Freight is quoted against actual carton count and destination port, not estimated from the production price. If you are budgeting a landed cost, the number to ask for is the one from wholesale shipping, customs and what buyers miss.

What a first order actually costs

Seven things that move the number, in the order you will ask about them.

Time and freight, in the order they bite

Nine questions about the clock, starting with the one every importer asks first.

Checking the supplier before you commit

Getting started

Tell us which line it is, your volume, and your destination market. We will quote per style so you can see where setup fees land, state the schedule with milestones named, and tell you what documentation your order can carry.

FAQ

What is your minimum order quantity?

100 pieces per design for stainless steel jewelry, 500 pieces per style and colour for jewelry boxes and organizers. The organizer figure is a hard floor.

How fast can I get a sample?

About 15 days. The bulk clock starts once you approve the sample.

What is the bulk production lead time?

About 45 days for the metal and box lines, about 25 days for bead strands. Production only — freight and customs sit on top.

Are customs duties included?

No. Our quotes cover manufacturing and China export clearance. Duties are set by your country and your importer of record. The mechanics are in wholesale shipping and customs.

Can you ship to my 3PL?

Yes. Under EXW we can address cartons to your warehouse or a third-party logistics provider, and under DDP we deliver to the address you give us.

Do you sell stock items for immediate shipment?

We are a manufacturer, not a warehouse. If you need catalogue stock on a short clock, ask and we will tell you honestly what can move quickly.

Will my reorder cost the same as my first order?

It costs less, because the tooling is already made. Material and process remain, so it is not automatically identical.

Can I visit the factory?

Yes. Bring your spec sheet and check the measurements against the actual product.

What this means for your order

If you are still deciding, one thing decides this for you: your unit cost turns on three variables only - quantity, box and finish specification, and destination market - and none of them are negotiable independently. Everything else on a quote page is presentation.

Where this falls short you need catalogue stock shipping this week we are not the right stop, because we make what you ask for rather than what we hold.

What to send us your SKU count, quantities and destination port, and we will come back with a lead time per step.